NFPA (Fire) 30A PDF

NFPA (Fire) 30A PDF

Name:
NFPA (Fire) 30A PDF

Published Date:
08/21/2017

Status:
Active

Description:

Motor Fuel Dispensing Facilities and Repair Garages, 2018 Edition

Publisher:
National Fire Protection Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
Codes and standards published by NFPA are displayed as read-only under license from NFPA solely for use within this system. NFPA material may not be downloaded, printed, reproduced, or transferred.

Fire safety at motor fuel dispensing operations and motor vehicle repair facilities depends on the critical guidelines in NFPA 30A.

Dispensing flammable motor fuels can present serious hazards that can be avoided by adhering to specialized guidelines. The 2015 edition of NFPA 30A: Code for Motor Fuel Dispensing Facilities and Repair Garages provides the latest rules for fuel storage and piping, fuel dispensing systems, and operating procedures for retail fuel dispensing, marine fuel dispensing, and fleet vehicle fuel dispensing. NFPA 30A also covers gaseous motor vehicle fuels when dispensed at the same locations as liquid fuels.

Major changes in this edition improve safety and expand the Code's scope:
  • A new Chapter 14 has been added to address the subject of on-demand mobile fueling.
  • Aboveground storage tanks installed within the scope of the Code must comply with all applicable provisions of Chapter 4.
  • A new provision mandates that a leak detection device must restrict or shut flow of fuel if a leak is detected, instead of simply providing an audible or visible indication of a leak.
  • When the emergency shutoff device is actuated, mechanical or electrical isolation of fluid handling systems other than fuel is now required.
  • Gas and vapor removal at the ceiling level is now required for areas where vehicles using lighter-than-air fuels are repaired.
  • Major repair garages that repair hydrogen-fueled vehicles now must also meet the provisions of NFPA 2: Hydrogen Technologies Code.
  • Added language clarifies that sprinkler protection provisions apply to the entire building wherein the repair garage is located.
  • Numerous other changes clarify the Code's intent and make requirements more explicit.
Clearer requirements mean better fire safety in service stations. Update to the 2018 edition of NFPA 30A today.

NFPA 30A is an essential resource for architects and engineers involved with design and construction of motor fuel dispensing facilities, AHJs and other professionals with oversight/review authority, and facility owners and operators.
ANSI : ANSI Approved
ISBN(s) : 9781455916634
Number of Pages : 52
Published : 08/21/2017

History

NFPA (Fire) 30A
Published Date: 08/25/2023
Code for Motor Fuel Dispensing Facilities and Repair Garages, 2024 Edition
$44.7
NFPA (Fire) 30A
Published Date: 06/21/2020
Code for Motor Fuel Dispensing Facilities and Repair Garages, 2021 Edition
NFPA (Fire) 30A
Published Date: 08/21/2017
Motor Fuel Dispensing Facilities and Repair Garages, 2018 Edition
NFPA (Fire) 30A
Published Date: 05/19/2014
Motor Fuel Dispensing Facilities and Repair Garages, 2015 Edition
NFPA (Fire) 30A
Published Date: 06/20/2011
Motor Fuel Dispensing Facilities and Repair Garages, 2012 Edition
NFPA (Fire) 30A
Published Date: 10/01/2007
Motor Fuel Dispensing Facilities and Repair Garages, 2008 Edition
NFPA (Fire) 30A
Published Date: 10/01/2003
Motor Fuel Dispensing Facilities and Repair Garages, 2003 Edition
NFPA (Fire) 30A
Published Date: 08/01/2000
Code for Motor Fuel Dispensing Facilities and Repair Garages, 2000 Edition

Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138